QUARTEL Military Accommodation Unit
Q U A R T E L
M · A · U · EST. 2026
Military Accommodation Unit

Quarters for deployment.

Modular accommodation units for armed forces & disaster management. Hotel-grade quarters in an ISO standard container — operational in 24 hours.

TYPE
QUARTEL-4 · 3N
SETUP TIME
24 H
STANDARD
ISO 45 FT HC
MADE IN
GERMANY

IMMEDIATE OPERATIONAL READINESS.

From site to occupation in 24 hours.

01
Setup in a single day
No foundation required
02
ISO standard container
Truck, rail, ship or CH-47 air lift
03
40+ years service life
Stainless steel construction

“Ready when it matters.”

CONTAINER
45FT
High-Cube · Sea container
SETUP
1DAY
No heavy equipment needed
LIFESPAN
40+ YR
95 % recyclable
COATING
RAL 6031
NATO Olive · Flecktarn optional

QUARTEL-4

4 Self-contained units Maximum privacy
FLOOR PLAN · 13.7 × 2.9 M
TechnikZimmer 1Bett 90×200SpindSchreibtischWC-BereichWCWBDuscheZimmer 2Bett 90×200SpindSchreibtischWC-BereichWCWBDuscheZimmer 3Bett 90×200SpindSchreibtischWC-BereichWCWBDuscheZimmer 4Bett 90×200SpindSchreibtischWC-BereichWCWBDusche
BEDLOCKERSANITARY
SLEEPING AREA
4
Beds
Single beds · 90 × 200 cm
4
Showers
Private shower · one per occupant
4
WCs
Private toilets & basins
FLOOR AREA
7,5 m²per room

QUARTEL-3N

3 rooms + central wet cell Shared central wet cell
FLOOR PLAN · 13.7 × 2.9 M
TechnikZimmer 1Bett 90×200SpindSchreibtischWC-BereichWCWBZimmer 2Bett 90×200SpindSchreibtischWC-BereichWCWBZimmer 3Bett 90×200SpindSchreibtischWC-BereichWCWBNasszelleDusche 190×90 cmDusche 290×90 cmUmkleidezone
BEDLOCKERWET CELL
LIVING + SANITARY
3
Beds
Larger rooms · single beds 90 × 200 cm
2
Showers
Shared · centralised maintenance
3
WCs
Private toilets & basins per room
FLOOR AREA
9–10 m²per room

QUARTEL-4 VS. QUARTEL-3N

Same shell, two interior philosophies.
CRITERION
QUARTEL-4VARIANT A
QUARTEL-3NVARIANT B
Occupancy
4 persons
3 persons
Rooms
4 × 7,5 m²
3 × 9–10 m²
Shower
4 × private
2 × shared
Toilet & basin
4 × private per room
3 × private per room
Privacy
Maximum
High
Sanitary maintenance
Distributed
Centralised
Best suited for
All scenarios
Base · exercise · FOB
QUARTEL-4
VARIANT A
QUARTEL-3N
VARIANT B
OCCUPANCY
4 persons
OCCUPANCY
3 persons
ROOMS
4 × 7,5 m²
ROOMS
3 × 9–10 m²
SHOWER
4 × private
SHOWER
2 × shared
TOILET & BASIN
4 × private per room
TOILET & BASIN
3 × private per room
PRIVACY
Maximum
PRIVACY
High
SANITARY MAINTENANCE
Distributed
SANITARY MAINTENANCE
Centralised
BEST SUITED FOR
All scenarios
BEST SUITED FOR
Base · exercise · FOB

HOTEL QUALITY. IN A CONTAINER.

Hotel-grade fit-out · sealed in a steel hull.

Bedroom
A · BEDROOM
Wet cell
B · WET CELL
Bedroom
Real wood panelling · indirect lighting · air conditioning · triple glazing · 230 V socket · LED reading lamp
Wet cell
Real glass shower · mirror with shelf · WC · washbasin · hairdryer · oak floor · climate unit

SIX SCENARIOS.
ONE CONTAINER.

Six deployment scenarios — one platform.

USE 01
Armed Forces / Base

Transitional quarters during renovation or capacity shortfalls. Immediately operational.

USE 02
Exercises & training areas

Temporary accommodation for troops up to 30 days. Rapid setup and breakdown.

USE 03
International missions / FOB

Expansion of Forward Operating Bases outside the combat zone.

USE 04
NATO allies

Compatible with NATO standard infrastructure. VJTF and partner nations.

USE 05
Disaster relief

Rapid deployment for civil protection agencies and relief organisations.

USE 06
Transit & redeployment

Rest periods for drivers of heavy military vehicles on redeployment routes.

BUILT FOR
THE FIELD.

Engineered for field conditions.

SPEC 01
24H
Operational

Full setup in one day. No heavy equipment required.

SPEC 02
ISO
Standard container

Transport by truck, rail, ship or CH-47 Chinook (sling load).

SPEC 03
−30°C
Cold-resistant

PUR spray foam insulation, triple-glazed windows, active heating.

SPEC 04
40+ YR
Service life

Stainless steel, 95 % recyclable, blast primer corrosion protection.

SPEC 05
BWID
Smart-card lock

Compatible with Bundeswehr ID cards and NATO access cards.

SPEC 06
RAL6031
Camo / NATO olive

Exterior coating in Flecktarn pattern or RAL 6031 on request.

FOUR STEPS TO OCCUPATION.

From site selection to occupation in four steps.

1
STEP 01 · 0 H
Select site

Asphalt, gravel or concrete slabs suffice. No foundation, no planning permission.

2
STEP 02 · 0–8 H
Transport & unload

ISO standard: truck, rail, ship. Air deployment by CH-47 Chinook possible.

3
STEP 03 · 8–18 H
Connect utilities

400 V power, 1-inch water, wastewater. Connected within a few hours.

4
STEP 04 · 24 H
Ready to deploy

Rooms occupied, locks programmed. Fully operational within 24 hours.

SCALABLE

Modularly expandable — multiple QUARTEL units side by side for company or battalion strength.

Field deployment · NATO Allied Base
Q
QUARTEL
M · A · U · EST. 2026
MISSION STATEMENT

Ready when
it matters.

CONTACT
www.quartel.org
info@quartel.org · +49 (0) 211 1760919-0
MADE IN
GERMANY